|
|
||||||||
|
Fig. 3. Rainfall and streamflow hydrographs for a 3-mo period during 2004 for each gauging site: (a) precipitation; (b) Catchment Nd, (c) Catchment Ne, (d) Catchment S, (e) Catchment L and (f) Catchment G. L and G are the control catchments. Precipitation and streamflow data are presented in mm at 5-min intervals for comparison.
|
| HOME | HELP | FEEDBACK | SUBSCRIPTIONS | ARCHIVE | SEARCH | TABLE OF CONTENTS |