Click on image to view larger version.

Fig. 3. Levels of Pb in the top 10 cm of soil along Transect 1, eastward from Engineer's Canal (0 m), which is west of Bayou Trepagnier. Transect 1 begins at the base of the spoil bank along Bayou Trepagnier. Soil organic material was scraped from 21 randomly located sites along a line beginning west of Transect 1, starting at Engineers Canal west of Bayou Trepagnier and extending east into the swamp, and a 0.5-L sample of soil was collected at each site and analyzed. The detection limit is 1 mg/kg.