Click on image to view larger version.

Fig. 8. Relationship between maximum change in concentration during a storm (= maximum storm concentration baseflow concentration) and disturbance for (A) total suspended sediment (TSS), (B) inorganic suspended sediment (ISS), (C) organic suspended sediment (OSS) (note different scale of the y axis), (D) soluble reactive phosphorus (SRP), and (E) nitrate (NO3). Data points are stream averages. Error bars are one standard error. Spearman rank correlational analysis results are given in each panel. Stream BC1 (tributary of Bonham Creek) was excluded from statistical analyses (see Results).