|
|
||||||||
|
Fig. 5. Removal efficiency (%) for suspended solids (SS) and total phosphorus (TP) in surface runoff during summer and winter. Experiments were conducted with 5- and 10-m-wide buffer zones at the Grorud site during 19921999 and 5-m-wide zones at the Mørdre site during 19992003.
|
| HOME | HELP | FEEDBACK | SUBSCRIPTIONS | ARCHIVE | SEARCH | TABLE OF CONTENTS |