|
|
||||||||
|
Fig. 1. Plot of ln (C/C0) vs. time (h) for RDX in Fort Greely surface soil under (A) unsaturated and (B) saturated conditions. Acetonitrile was added to a final concentration (volume basis) of 0 µL L-1 (0%), 1000 µL L-1 (0.1%), and 10 000 µL L-1 (1%).
|
| HOME | HELP | FEEDBACK | SUBSCRIPTIONS | ARCHIVE | SEARCH | TABLE OF CONTENTS |