|
|
||||||||
|

Fig. 2. Minimum number of subsamples required in a zig-zag pattern to obtain an estimate of soil P with >0.9 level of probability within 10 and 20% of the measured mean, within the 95% confidence interval of the measured mean, and within 15 mg kg-1 soil P for pastures with less than 30 samples taken.
|
| HOME | HELP | FEEDBACK | SUBSCRIPTIONS | ARCHIVE | SEARCH | TABLE OF CONTENTS |