Fig. 2. Schematic of the miscible-displacement experimental setup. Tygon tubing (6-mm i.d.) was used for all connections. In Experiment 1, the effluents from the soil column were directly collected in the fraction collector without running through the stainless steel cylinder and trapping 14CO2 in NaOH.