Fig. 5. Removal efficiency (%) for suspended solids (SS) and total phosphorus (TP) in surface runoff during summer and winter. Experiments were conducted with 5- and 10-m-wide buffer zones at the Grorud site during 19921999 and 5-m-wide zones at the Mørdre site during 19992003.