Click on image to view larger version.



Fig. 7. Rainfall, overland flow, and A–B and B–C interflow from 1996 to 1999 from G0 and G15 (soils treated with 0 and approximately 15 Mg ha–1 of gypsum, respectively). Gypsum was applied to G15 on 1 June 1998.