Click on image to view larger version.



Fig. 1. Location of the eastern and the western subcatchments used in this study relative to the Mt. Bold public water supply reservoir. The eastern subcatchment (G15) was treated with 15 Mg ha–1 gypsum and the western subcatchment (G0) was untreated.