Fig. 5. Bromide breakthrough curves measured in stainless steel suction samplers at 1.5- and 3-m depths at the low P monitoring well site up-gradient of the winter sprayfields. Wastewater containing Br was applied on Days 50 through 52 from the start of the experiment at the well site. Bromide breakthrough in the samplers was monitored from Day 50 to 56.