Click on image to view larger version.



Fig. 1. Containment used in the breakthrough study at the low P monitoring well site. (Top) construction of the containment; (bottom) location of stainless steel suction samplers relative to well. Phosphorus and Br breakthrough were monitored in MW-31S monitoring well during the experiment.