Click on image to view larger version.



Fig. 2. Time to first observed overland flow under simulated rainfall conditions (38 mm per 30 min application rate). At each site two paired plots (solid triangles and squares) were sampled on two consecutive days (first day: solid triangles and squares; second day: open triangles and squares). Refer to Table 1 for a description of site codes. The dashed line indicates 20-min threshold.