Fig. 2. Time course of pH, dissolved oxygen, five-day biological oxygen demand (BOD5), and temperature of raw wastewater input and of drainage water from aerated lysimeters (AIR) and lysimeters vented to the leachfield (LEACH). The wastewater loading rate was changed from 12 to 4 cm d1 on 21 Apr. 2003. Temperature was not measured on 12 Feb. 2003. Values are means (n = 3). Bars represent one standard deviation. Significant differences between AIR and LEACH treatments (P < 0.05) for a particular sampling date are indicated with an asterisk (*).