Click on image to view larger version.



Fig. 3. Percent aqueous Cr(VI) removal measured in mixtures of high- (HI) and medium-contamination (MD) soil compared with sterilized controls. Close hatch bars represent removal observed after 9 wk, and the bars with wider hatch represent removal between 9 and 16.5 wk.