Click on image to view larger version.



Fig. 7. Observed (discrete points) H+ breakthrough curve (BTC) in effluent from an Arredondo Ap soil column injected with a pulse of high hyrdazinium concentration (22.15 molc m-3). Simulated BTCs with (smooth lines) and without (broken lines) chemisorption of exchange-phase N2H+5 are given.