Fig. 3. Total hydrocarbon fluxes over a diesel fuelcontaminated soil landfarm. Measurements made between 15 and 23 June 1996. Landfarm construction was completed on DOY 167. Tilling was performed in the afternoon of DOY 167 and the morning of DOY 171.